We are in month three of construction on the new Trustmark Bank branch in Fondren, and CDFL’s future new home, and things are moving along. Here’s a peek into what’s happening on site.

IMG_1219-500x375 (1).jpg

The first slab has been poured. This slab is for the stair tower on the north side.

IMG_1218-500x375 (1).jpg

Columns being set in place.

IMG_1214-500x375 (1).jpg

The crawl space mud slab was poured along with the majority of the vault being constructed.

IMG_1222-e1532527626599-500x375 (1).jpg

Applying waterproofing to the concrete wall along Old Canton.