B 5025 WEG Large Drone Boat Maintenance Facility
This project replaced the demolished 5025 boat maintenance facility which was destroyed by Hurricane Michael. Located on the waterfront of Bonita Bay, it was 2 story construction with a storage mezzanine, providing maintenance to the fleet’s large boats and housing WEG drone retrieval operational offices.
High-velocity Hurricane Zone construction, load-bearing masonry with standing seam metal roof. A High-Performance Sustainable Building, this project features Whole-Building Commissioning and Third-Party Certification. New Construction, USACE Design-Build with HW Pence.